Loading
Loading
Winding cleaning, bearing and seal replacement, checks on connections, protections and starters, alignment, and measurement of temperature, current per phase and vibration. Every visit leaves an equipment log with what was measured, what was replaced and what to watch, and it is scheduled inside your planned shutdowns.
In detail
The industrial maintenance we do follows the same idea as the rest of the workshop: measure before forming an opinion. A preventive routine is not wiping things down and tightening bolts; it is recording temperature, current per phase, bearing condition and connections on every visit, so the log shows the trend and the motor gets attention before it stops the line.
We schedule routines around your planned shutdowns so we don't cost you production, and we handle corrective work when something has already failed. Every visit ends with an equipment record of what was measured, what was replaced and what is worth watching.

What we handle
Industries
It depends on operating hours and environment: a motor in a dusty or humid area needs checking more often than one in a clean area. We set it from your real working hours, not from a generic calendar.
Yes, and that is how we prefer to do it. We schedule routines inside your shutdown windows so we don't add downtime to the plant.
An equipment log with the visit's measurements, what was replaced and the recommendations. Across several visits it becomes a history that lets you anticipate failures.
Yes. For an unplanned shutdown the phone is the fastest channel, and we deliver a diagnosis within the first 24 hours.

Rewinding of single-phase A.C. and D.C. motors and transformers.

Bearings, shafts, housings and centrifugal pumps.

Insulation, resistance, current and temperature.

Motors, pumps, spare parts and winding materials.
Contact us and we'll give you the solution.